2024 BMW X5 M Competition

M Competition, Executive Package, Bowers & Wilkins Diamond Surround Sound System, Pano Roo

$79,481

53,659 Miles
5YM13ET05R9S82169
Stock #: R9S82169A
Show Me the CARFAX Good Value Badge
  Drivetrain   AWD
  Transmission   8-speed automatic
  Engine   8cyl - 4.4L
  Fuel Type   Gas
  MPG City   13
  MPG Highway   18
  Interior   Black
  Exterior   Alpine White

Alpine White 2024 BMW X5 M Competition AWD 8-Speed Automatic Sport 4.4L V8 DOHC 32V TwinPower Turbo 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Active Cruise Control w/Stop & Go, Active Driving Assistant Pro, Active Lane Keeping Assistant, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM with 360L, AM/FM Stereo, Apple CarPlay & Android Auto Compatibility, Apple CarPlay Compatibility, Auto High-beam Headlights, Auto tilt-away steering wheel, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Auto-leveling suspension, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Bowers & Wilkins Diamond Surround Sound System, Brake assist, Bumpers: body-color, Compass, Connected Package Pro, ConnectedDrive Services, Delay-off headlights, Driver door bin, Driver vanity mirror, Driving Assistance Professional Package, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Executive Package, Extended Merino Leather Seat Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front & Rear Heated Seats, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front Massaging Seats, Front reading lights, Front Ventilated Seats, Fully automatic headlights, Garage door transmitter, Gesture Control, Heads-Up Display, Heated & Cooled Cupholders, Heated door mirrors, Heated Front Seats, Heated front seats, Heated steering wheel, Illuminated entry, Knee airbag, Leather steering wheel, Live Cockpit Pro, Low tire pressure warning, Lumbar Support, M Compound Brakes w/Red Calipers, Memory seat, Multi-Function Seats w/Lumbar Support, Navigation System, Occupant sensing airbag, Outside temperature display, Overhead console, Panic alarm, Panoramic Sky Lounge LED Roof, Passenger door bin, Passenger vanity mirror, Personal eSIM 5G, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Rain sensing wipers, Rear air conditioning, Rear dual zone A/C, Rear Manual Side Window Shades, Rear reading lights, Rear seat center armrest, Rear window defroster, Rear window wiper, Remote keyless entry, SiriusXM w/360L & 1 Yr Platinum Plan Subscription, Soft-Close Automatic Doors, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Split folding rear seat, Spoiler, Sport steering wheel, Steering wheel memory, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Traffic Jam Assistant, Trip computer, Turn signal indicator mirrors, Variably intermittent wipers, Wheels: 21" x 10.5" Fr & 22" x 11.5" Rr Bi-Color, Wireless Device Charging.Recent Arrival!

Equipment 

Comfort
Seating capacity: 5
Driver seat direction: Driver seat with 14-way directional controls
Passenger seat direction: Front passenger seat with 14-way directional controls
Front head restraints: Fixed front seat head restraints
Rear seats fixed or removable: Fixed rear seats
Rear seats: Rear bench seat
Rear seat folding position: Fold forward rear seatback
Folding rear seats: 40-20-40 folding rear seats
Rear head restraints: Height adjustable rear seat head restraints
Rear head restraint control: Manual rear seat head restraint control
Rear head restraint control: 3 rear seat head restraints
Front seatback upholstery: Plastic front seatback upholstery
Headliner material: Alcantara simulated suede headliner material
Headliner coverage: Full headliner coverage
Floor covering: Full carpet floor covering
Floor mats: Carpet front and rear floor mats
Panel insert: Carbon fibre and metal-look instrument panel insert
Gearshifter material: Leather and chrome gear shifter material
Door panel insert: Carbon fibre and metal-look door panel insert
Console insert material: Carbon fibre and metal-look console insert
Interior accents: Metal-look interior accents
Dashboard material: Leather upholstered dashboard
Rear seatback upholstery: Carpet rear seatback upholstery
Number of memory settings: 2 memory settings
Climate control: Automatic climate control
Air conditioning: Yes
Dual-zone front climate control: Dual-zone front climate control
Rear climate control: Rear climate control system with separate controls
Cabin air filter: Cabin air filter
Rear under seat ducts: Rear under seat climate control ducts
Residual heat recirculation: Residual heat recirculation
Dual-zone rear climate control: Dual-zone rear climate control
Rear headliner/pillar ducts: Rear headliner/pillar climate control ducts
Rear console climate control ducts: Rear console climate control ducts
Steering wheel material: Leather steering wheel
Steering wheel tilt: Power tilting steering wheel
Steering wheel telescopic: Power telescopic steering wheel
Heated steering wheel: Heated steering wheel
Tinted windows: Deep tinted windows
Armrests rear: Rear seat center armrest
Heated door panel: Heated door panel
Armrests front center: Front seat center armrest
Sport steering wheel: Sport steering wheel
Floor coverage: Full floor coverage
Armrests front heated: Heated front seat center armrest
Convenience
Passenger doors rear left: Conventional left rear passenger door
Rear cargo door: Power liftgate/tailgate rear cargo door
Heated door mirrors: Heated driver and passenger side door mirrors
Door mirror with tilt-down in reverse: Power passenger door mirror with tilt down in reverse
Passenger doors rear right: Conventional right rear passenger door
Visor driver mirror: Driver visor mirror
Visor illuminated driver mirror: Illuminated driver visor mirror
Visor passenger mirror: Passenger visor mirror
Visor illuminated passenger mirror: Illuminated passenger visor mirror
Rearview mirror: Auto-dimming rear view mirror
Beverage holders: Front beverage holders
Rear seat direction: Front facing rear seat
Memory settings: Memory settings include: door mirrors and steering wheel
Floor console: Full floor console
Floor console storage: Covered floor console storage
Overhead console: Mini overhead console
Glove box: Illuminated locking glove box
Number of beverage holders: 8 beverage holders
Seatback storage pockets: 2 seatback storage pockets
Door bins front: Driver and passenger door bins
Door bins rear: Rear door bins
Cargo floor type: Carpet cargo area floor
Cargo cover: Roll-up cargo cover
Cargo tie downs: Cargo area tie downs
Cargo light: Cargo area light
Concealed cargo storage: Cargo area concealed storage
Steering mounted audio control: Steering wheel mounted audio controls
Cargo access: Comfort Access proximity cargo area access release
Cell phone: Cell phone pre-wiring
Driver foot rest: Driver foot rest
Accessory power: Retained accessory power
Garage door opener: Garage door opener
12V power outlets: 4 12V power outlets
Remote parking: Remote control parking
Door locks: Power door locks with 2 stage unlocking
Keyfob keyless entry: Keyfob keyless entry
All-in-one key: All-in-one remote fob and ignition key
Auto door locks: Auto-locking doors
Fob engine controls: Comfort Access with hands-free access and push button start
Interior lock disable: Interior lock disable
Valet key: Valet key
Auto-dimming door mirror driver: Auto-dimming driver side mirror
Fuel door lock: Power fuel door lock
Tailgate control: Tailgate/power door lock
Keyfob cargo controls: Keyfob trunk control
Keyfob window controls: Keyfob window control
Keyfob sunroof controls: Keyfob sunroof/convertible roof control
Keyfob remote start: Keyfob remote start
Tachometer: Tachometer
Engine/electric motor temperature gauge: Engine/electric motor temperature gauge
Clock: Digital clock
Compass: Compass
Temperature display: Exterior temperature display
Speedometer: Redundant digital speedometer
Folding door mirrors: Power folding door mirrors
Engine temperature warning: Engine temperature warning
Battery charge warning: Battery charge warning
Low level warnings: Low level warning for oil, coolant, fuel, washer fluid and brake fluid
Key in vehicle warning: Key in vehicle warning
Bulb warning: Bulb failure warning
Door ajar warning: Rear cargo area ajar warning
Oil pressure warning: Oil pressure warning
Transmission fluid temperature warning: Transmission fluid temp warning
Brake pad warning: Brake pad wear indicator
Trip computer: Trip computer
Auto tilt steering wheel: Auto tilt-away steering wheel
First-row windows: Power first-row windows
Third-row windows: Fixed third-row windows
Second-row windows: Power second-row windows
One-touch down window: Front and rear one-touch down windows
One-touch up window: Front and rear one-touch up windows
Wipers: Variable intermittent front windshield wipers
Speed sensitive wipers: Speed sensitive wipers
Rear window defroster: Rear window defroster
Rear windshield: Fixed rear windshield
Traffic camera: Drive Recorder 360 degree traffic cameras
Beverage holders rear: Rear beverage holders
Auto-dimming door mirror passenger: Auto-dimming passenger side mirror
Built-in virtual assistant: BMW Intelligent Personal Assistant built-in virtual assistant
Driver information center: Driver information center
Day/Night rearview mirror: Day/Night rearview mirror
Rear windshield wipers: Rear windshield wipers
Front reading lights: Front reading lights
Rear reading lights: Rear reading lights
Variable panel light: Variable instrument panel light
Ambient lighting: Ambient lighting
Headlights on reminder: Headlights on reminder
Illuminated sill plates: Illuminated sill plates
Illuminated glove box: Illuminated glove box
Trip odometer: Trip odometer
Over the air updates: Over the air updates
Full gauge cluster screen: Full gauge cluster screen
Smart device-as-key proximity door locks: BMW Digital Key smart device-as-key proximity door locks
Smart device remote start: Smart device remote start
Ignition type: Push-button
Original Warranty
Basic warranty: 48 month/50,000 miles
Powertrain warranty: 48 month/50,000 miles
Corrosion perforation warranty: 144 month/unlimited
Roadside warranty: 48 month/unlimited
Maintenance warranty: 36 month/36,000 miles
High voltage electrical system: 96 month/80,000 miles
Safety and Security
Electronic stability control: Electronic stability control system with anti-roll
ABS Brakes: 4-wheel antilock (ABS) brakes
Brake assist system: Brake assist system
Hill control: Hill descent control
Post collision braking system: Automatic post-collision braking system
Headlight type: Projector beam headlights
Headlights: LED low and high beam headlights
Auto headlights: Auto on/off headlight control
Running lights: LED daytime running lights
Multiple headlights: Multiple enclosed headlights
Delay off headlights: Delay-off headlights
Auto levelling headlights: Auto-leveling headlights
Adaptive headlights: Directionally adaptive headlights
Front cornering lights: Front cornering lights
High mount stop light: High mounted center stop light
Perimeter approach lighting: Remote activated perimeter approach lighting with puddle lights
LED brake lights: LED brake lights
Front impact airbag driver: Driver front impact airbag
Front side impact airbag driver: Seat mounted side impact driver airbag
Overhead airbags: Curtain first and second-row overhead airbags
Front impact airbag passenger: Passenger front impact airbag
Front side impact airbag passenger: Seat mounted side impact front passenger airbag
Occupancy sensor: Airbag occupancy sensor
Knee airbag: Driver and passenger side knee airbag
Number of airbags: 8 airbags
3-point seatbelt: Rear seat center 3-point seatbelt
Seatbelt pretensioners: Front seatbelt pretensioners
Illuminated entry: Illuminated entry
Instrumentation display: Live Cockpit Professional digital/analog instrumentation display
Configurable instrumentation gauges: Configurable instrumentation gauges
Head up display: Head-up display
Front camera: Front mounted camera
Right camera: Right side camera
Low tire pressure warning: Tire specific low air pressure warning
Lane departure: Lane Departure Warning
Rear collision warning: Rear collision mitigation
Pedestrian detection: City Collision Mitigation pedestrian impact prevention
Driver attention monitor: Driver attention alert
Traffic sign information: Speed Limit Info traffic sign recognition
Immobilizer: Immobilizer
Vehicle tracker: Vehicle tracker
Security system: Security system
Heated wipers: Heated front windshield jets
Rain detecting wipers: Rain detecting wipers
Hill start assist: Hill start assist
Auto high-beam headlights: High Beam Assistant auto high-beam headlights
Seatbelt pretensioners number: 2 seatbelt pre-tensioners
Child door locks: Manual rear child safety door locks
Left camera: Left side camera
Turn signal in door mirrors: Turn signal indicator in door mirrors
Rear camera: Rear mounted camera
Parking sensors: Park Distance Control front and rear parking sensors
Gauge cluster display size (inches): Gauge cluster display size: 12.30
Camera: Surround View w/3D View aerial view camera
Number of door entry light(s): 4 door entry light(s)
Remote panic alarm: Remote panic alarm
Illuminated ignition switch: Illuminated ignition switch
DRL preference setting: DRL preference setting
Automatic brake hold: Automatic brake hold
Automatic vehicle parking: Park Distance Control automatic vehicle parking
In-car Entertainment
Seek scan: Seek scan
RDS: Radio data system (RDS)
External memory: External memory control
Internal storage: Internal storage capability
Internet radio capability: Internet radio capability
Audio theft deterrent: Audio system theft deterrent
Voice activated audio: Voice activated audio controls
Speed sensitive volume: Speed sensitive volume
Wireless streaming: Bluetooth wireless audio streaming
Antenna: Window grid and roof mount audio antenna
Number of first-row screens: 2 total number of 1st row displays
Primary display size: 14.9 inch primary display
Primary display touchscreen: Primary monitor touchscreen
Data recorder: Performance data recorder
Internal storage GB: 20 GB internal storage
Antenna: Diversity antenna
Speakers number: 16 speakers
Exterior and Appearance
Spoiler: Rear lip spoiler
Body panels: Galvanized steel/aluminum/composite body panels with side impact beams
Number of doors: 4 doors
Bumpers front: Body-colored front bumper
Bumpers rear: Body-colored rear bumper
Rocker panel extensions: Rocker panel extensions
Wheel well trim: Body-colored wheel well trim
Grille style: Dark chrome grille
Window Trim: Dark chrome side window trim
Door handle material: Body-colored door handles
Special paint: Monotone paint
Body accent: Exterior badging
Spare tire: Compact spare tire with steel wheel
Spare tire location: Spare tire mounted under the cargo floor
Door mirror type: Standard style side mirrors
Door mirror style: Black door mirrors
Bumper rub strip rear: Black rear bumper rub strip
Windshield trim: Black windshield trim
Rear window trim: Black rear window trim
Roof rails: Roof rails
Powertrain and Mechanical
Alternator Type: Hybrid starter generator alternator
Battery type: Lead acid battery
Radiator: Radiator
Start-stop engine: Auto stop-start engine
Drivetrain selectable: Driver selectable drivetrain mode
Selectable mode transmission: Selectable mode transmission
Transmission oil cooler: Transmission oil cooler
4WD type: Full-time AWD
Drive type: All-wheel drive
Traction control: All-speed ABS and driveline traction control
V traction battery: 48
Traction battery type: Lithium ion (Li-ion)
Suspension: Sport ride suspension
Suspension control: Dynamic Damper Control driver controlled suspension ride settings
Suspension auto correcting: Active Roll Stabilization adaptive ride suspension
Suspension ride type front: Independent front suspension
Suspension type front: Double wishbone front suspension
Front anti-roll: Active Roll Stabilization active front anti-roll
Springs front: Front coil springs
Shock absorbers: Gas-pressurized shock absorbers
Suspension ride type rear: Independent rear suspension
Rear anti-roll: Active Roll Stabilization active rear anti-roll
Springs rear: Rear air springs
Rear Springs: Regular grade rear springs
Speed sensitive steering: M Servotronic speed sensitive power steering
Steering: Electric power-assist steering system
Steering type: Rack-pinion steering
Ventilated brakes: Front and rear ventilated disc brakes
ABS Brakes: Four channel ABS brakes
Electronic parking brake: Electronic parking brake
Regenerative brakes: Regenerative brakes
Painted calipers: Blue painted front and rear brake calipers
Cross drilled brakes: Cross drilled/slotted front disc brakes
Eco Feedback: ECO feedback display gauge
Suspension auto-leveling: Auto-leveling rear suspension
Driver selectable steering effort: Driver selectable steering effort
Suspension type rear: Multi-link rear suspension
Tailpipe: Stainless steel dual exhaust with dark chrome tailpipe finisher
Multi-mode exhaust: M Sport Exhaust multi-mode exhaust
Limited slip differential: Active M Differential electro-mechanical limited slip differential
Sequential shift control: STEPTRONIC Sequential shift with steering wheel controls
Locking hub control: Permanent locking hub control
Technology and Telematics
Real time traffic: Real-time traffic
Real time weather: Real-time weather
Handsfree: Bluetooth handsfree wireless device connectivity
USB ports: 2 USB ports
Augmented reality navigation system: Augmented reality navigation system
Mobile app access: Mobile app access
Fuel Economy and Emissions
Emissions: LEV3-ULEV125 emissions
Emissions tiers: Tier 3 Bin 125 emissions